Scheduled repairs have been completed at the Tengiz field on two of the five technological threads of the Integrated Production Lines plant, the operator of the Tengizchevroil project (TCO) said.
"Tengizchevroil (TCO) has safely completed planned major repairs on two of the five technological threads at the Integrated Production Lines (CTL)...