Kazakhstan calculated losses due to repairs at the Caspian Pipeline Consortium. According to the Ministry of Energy, in connection with the restoration work at the CPC, the volume of lost production may amount to about 320 thousand barrels per day, or 1.3 million tonnes for the period of repair until...