The reception of oil into the Tengiz-Novorossiysk system is carried out at a minimum capacity, the remote mooring unit (TLU) 1 is suitable for operating activities, the Caspian Pipeline Consortium (CPC) said, Interfax reports.
“As of March 28, 2022, oil is received into the Tengiz-Novorossiysk system at minimum capacity. VLU-1 was...