Another plant in Kazakhstan never opens

12.04.2022

A plant for 33.2 billion tenge will not be built in the Aktobe region. This was reported in the regional administration.

The project was planned to be implemented in 2019 in the Aktobe industrial zone. According to the information, the construction of a plant for the production of industrial wind turbines...