Kazakhstan requires funds to ensure launch of smart grids by 2035

18.05.2022

To cover the prospective electricity consumption in the UES of Kazakhstan by 2035, it is planned to introduce about 17.5 GW of new generating capacities, and their structure will be represented by various technologies and their locations. In this regard, the system operator of the Kazakhstani electric power industry KEGOC...