Transneft Druzhba has connected the reconstructed section of the main oil product pipeline (MOPP) Ufa-Western direction in the Penza region.
Construction and installation work has been carried out at the Nikulino-Penza technological site as part of the technical re-equipment, reconstruction and overhaul program since November 2021.
Specialists replaced 14 km of the...