Kazakhstan needs 182 billion tenge to save 19 thermal power plants in red zone

21.12.2022

Billions of tenge will be required for the modernisation and repair of thermal power plants located in the red zone. The figures were announced by Energy Minister Bolat Akchulakov.

"According to preliminary data, 182 billion tenge is needed to carry out these works. And 93 billion tenge is needed to repair...