Billions of tenge will be required for the modernisation and repair of thermal power plants located in the red zone. The figures were announced by Energy Minister Bolat Akchulakov.
"According to preliminary data, 182 billion tenge is needed to carry out these works. And 93 billion tenge is needed to repair...