CHPP-2 in Almaty will be switched to gas by 2026. The Ministry of Energy announced the details of the modernisation. According to the agency, the plant's capacity will be 600 MW. It will require 1.5 billion cubic metres of gas per year. The transition to gas will be phased: the...