KMG Delays First Drilling at Atash

25.05.2006
Despite the positive results of seismic prospecting on the licensed Atash site in the Caspian Sea, which will be developed by KazMunaiGaz and LUKoil Overseas as part of the joint project, Dostyk on a 50/50 basis, the drilling at the block has now been postponed until 2008, according to the...