TCO tests Second Generation Project

14.11.2006
    Tengizchevroil has announced the beginning of the underground pumping of gas as part of the implementation of the second generation project at the Tengiz deposit, according to Kazinform.     The test, which was conducted on November 6th, is a part of an effort to increase production. The first test included the...