TCO to Transit 13 Million Tons of Oil by Railway

18.02.2008
    Tengizchevroil has begun the construction of a branch line connect the Tengiz field with the district center of Kulsary. The total length of the railway is about 100 kilometers.     Construction is scheduled to be completed in 2009. The main reason for the construction is the overloading of the existing line.     Due...