BTC Pipeline to get Fire, Gas-Detection Systems

23.06.2009
    Tefken Construction & Installation Co. has chosen Honeywell International to design, configure, install, and initiate a fire and gas-detection system at the terminal of the 1,800-km Baku-Tblisi-Ceyhan pipeline.     The system will include Honeywell's Safety Manager and Searchline Excel open-path gas detectors, as well as closed-circuit television flame detectors. The system...