Caspian CPC pipeline upgraded
30.10.2012
By E. Kosolapova
The main pipeline of the Caspian Pipeline Consortium was halted at 72 hours for the work to connect the re-commissioned equipment to the system and replace the valves from October 23-25, the consortium said on Monday.
'This is the third and final planned stop of the oil pipeline this...