Roxi Petroleum reports successful NK-12 well testing on the Galaz block
14.03.2013
Roxi Petroleum announced Friday that testing was successful on the NK-12 well in the NW Konys field at the Galaz block commenced on 2 March 2012 with a flow rate of 117bopd.
The company expects gross production from the Galaz block to be above 1,400 bopd once NK-12 is completely operational....